Retrofitting

Buildings and Cities

Retrofitting

Retrofitting means upgrading the buildings we already have, their walls, windows, heating, and controls, so they use far less energy for the rest of their lives. It matters because most of the buildings that will stand in 2050 are already built, so new green construction alone can never clean up the cities we live in.

🌳Generations

The effect arrives across lifetimes. This is a gift to people you will not meet.

Origins

Fixing up old buildings is as old as building, but retrofitting for energy began in earnest with the oil shocks of the 1970s. Suddenly heating bills mattered, and governments in North America and Europe launched programs to weatherize homes and tighten public buildings. Most of that early work was piecemeal: some caulk here, a new boiler there.

The idea of the deep retrofit grew out of the passive house and low energy building movements in Germany and Scandinavia in the 1990s and 2000s. Builders showed that an ordinary older house could be wrapped in insulation, sealed, and fitted with efficient ventilation until it used a fraction of its former energy. In 2010, the owners of the Empire State Building completed a widely studied retrofit that proved the same logic could pay off in an iconic skyscraper.

Around the same time, a Dutch program called Energiesprong asked a sharper question: what if retrofits were manufactured rather than handcrafted? Its teams began wrapping row houses in factory built insulated panels, adding solar roofs and compact heat pump modules, and finishing the work in days rather than months. That model has since spread to the United Kingdom, France, Germany, and North America.

What it actually is

A retrofit is any upgrade to an existing building that cuts its energy use or emissions. The phrase covers a wide range, from swapping light bulbs and adding a smart thermostat to a full rebuild of the building's skin and systems while the structure stays standing.

Practitioners usually think in layers. The envelope comes first: insulation, air sealing, better windows, and fixing thermal bridges where heat leaks through framing or concrete. Then come the systems: replacing fossil fuel boilers and furnaces with heat pumps, upgrading ventilation with heat recovery, and switching to efficient water heating. Last come controls and generation: building automation, metering, and rooftop solar.

A deep energy retrofit tackles all of these together and is commonly defined as cutting a building's energy use by roughly half or more. A staged retrofit does the same work over years, timed to when a roof, boiler, or facade is due for replacement anyway. Both can work; the trick is making sure early steps do not lock in choices that block later ones, like installing a big new gas boiler a year before the envelope is fixed.

The order matters because each layer changes the next. A well insulated building needs a much smaller heat pump. A smaller heat pump needs less electrical capacity and fewer solar panels to offset. Done in the right sequence, the whole project often costs less than doing each piece separately.

Retrofits also carry a hidden climate bonus. Keeping a building standing avoids the large emissions locked in the concrete, steel, and glass of a replacement. Renovating well is often the lower carbon choice than demolishing and building new, even if the new building is efficient.

The numbers

Buildings' share. The UN Environment Programme's Global Status Report for Buildings and Construction 2024/2025 attributes roughly a third of global energy related carbon dioxide emissions to buildings, counting both their operation and their construction.

The renovation gap. The European Commission estimates that only about 1 percent of the EU's buildings undergo energy renovation each year, far too slow for a stock in which roughly three quarters of buildings are energy inefficient.

A landmark result. The Empire State Building retrofit, designed with Rocky Mountain Institute, cut the building's energy use by about 38 percent and saves roughly 4.4 million dollars a year in energy costs.

Laws with teeth. New York City's Local Law 97 sets carbon limits for most buildings over 25,000 square feet, with a goal of a 40 percent cut in citywide building emissions by 2030. City data from the first compliance year showed the large majority of covered buildings meeting their limits.

Europe's new rules. The EU's recast Energy Performance of Buildings Directive, adopted in 2024, requires member states to focus renovation on their worst performing buildings and sets a path toward a zero emission building stock by 2050.

Why it matters

The math of the building stock is unforgiving. Buildings last fifty to a hundred years or more. Even if every new building from today were perfectly efficient, the old ones would still burn fuel for decades. Retrofitting is the only way to reach the homes, schools, offices, and apartment blocks where most emissions actually come from.

That said, retrofitting is slow, labor intensive, and expensive per building, and it has been oversold before. Programs that promised big savings sometimes delivered less because of poor installation, people heating homes that had been cold before, or measures chosen for ease rather than impact. A retrofit is not a single solution so much as a craft, and quality varies widely.

Its strength is that the gains compound across generations. A deep retrofit done well today keeps paying back in lower bills, lower emissions, and better comfort for whoever lives or works in the building for the next half century. It also keeps neighborhoods intact, avoiding the waste and displacement that demolition often brings.

The human side is concrete. Retrofits warm drafty apartments, cool overheated top floors, quiet street noise, cut indoor air pollution from gas appliances, and lower bills for households who spend the largest share of their income on energy. Where programs prioritize those households, retrofitting becomes one of the most direct ways climate policy improves daily life.

What it actually takes

Make a whole building plan. Map every upgrade the building will need over the next twenty years so each step, from the next roof to the next boiler, moves in the same direction.

Fix the envelope before sizing new equipment. Insulation, air sealing, and window work shrink the heating and cooling load, so the heat pump and electrical upgrades that follow can be smaller and cheaper.

Electrify at replacement time. When a gas boiler, furnace, or water heater fails, replace it with a heat pump rather than another fossil system that will run for twenty years.

Industrialize where you can. Prefabricated facade panels, standard heat pump modules, and repeatable designs for common building types cut cost and disruption, especially for row houses and apartment blocks.

Measure the results. Meter energy use before and after, and publish it. Measured savings build trust, reveal installation problems, and help lenders and policymakers back what works.

Protect tenants. Pair retrofit funding with rules that prevent large rent increases or evictions, so the people the upgrades are meant to help can stay to enjoy them.

Where it matters most

The Dutch Lowlands and North Sea region is where industrial retrofitting took shape. Long rows of similar postwar social housing made the Netherlands an ideal testing ground for Energiesprong's factory built facades and rooftop energy modules, and the lessons now travel across Europe.

In the English Midlands, a large stock of older brick terraces and social housing, much of it hard to heat, makes retrofitting both a climate necessity and a fuel poverty remedy. Nottingham was one of the first places in Britain to try the Energiesprong approach on council homes.

Across the North German Plain and Baltic, millions of homes built before modern energy standards still heat with gas or oil. Germany's long running renovation finance programs and the region's prefabricated apartment blocks make it one of Europe's largest retrofit markets and one of its most politically contested.

In the Scottish Highlands, many rural homes are old, stone built, off the gas grid, and heated with oil or electric resistance heaters. Careful retrofits that respect traditional construction and manage moisture can cut some of the highest heating costs in Britain.

How to tell it’s being done well

Is there a plan for the whole building? Good retrofits follow a long term roadmap rather than one off fixes, so no step locks in a fossil fuel system or blocks a later upgrade.

Did energy use actually fall? The best projects measure consumption before and after and share the results. Savings on paper are not the same as savings on the meter.

Are the occupants more comfortable? A well done retrofit removes drafts, cold walls, and overheated rooms, and brings in fresh air through planned ventilation rather than leaks. Residents should notice the difference.

Was the work done with the people inside in mind? Quick, low disruption installation and clear communication matter, especially in occupied apartment buildings, where weeks of construction can be a real burden.

Did the tenants stay? For rental housing, success means the people living there before the retrofit can afford to stay after it. Rising rents that push them out turn a climate win into a social loss.

What you can do

Anyone

  • Find out what your city or state requires of large buildings and what retrofit incentives exist; building performance laws are spreading and public support helps them hold.
  • Support local programs that train retrofit workers, since a shortage of skilled installers is one of the biggest bottlenecks.

Homeowners and renters

  • Homeowners can commission an energy audit and ask for a staged plan that lines up insulation, electrification, and solar with the natural replacement dates of roof, furnace, and water heater.
  • Renters can ask landlords whether upgrades are planned, request efficiency improvements at lease renewal, and look into tenant protections tied to retrofit funding.

Building owners and managers

  • Benchmark every building's energy use, then build a capital plan that schedules deep upgrades when major equipment is due for replacement.
  • Consider whole building retrofits for similar properties in batches, which brings down cost per unit and makes financing easier to secure.

Policymakers

  • Adopt building performance standards with clear targets, long lead times, and support for affordable housing owners to meet them.
  • Fund retrofits for low income and rental housing first, with anti displacement protections attached to the money.

Who is working on this

We are researching which organizations in our directory of 8,493 actively work on this solution, and we only list an organization once we have verified it. That research is ongoing. In the meantime, search the directory yourself:

Search the directory for “Retrofitting” →

Questions

What is the difference between a retrofit and a renovation?

A renovation can be purely cosmetic. A retrofit specifically upgrades a building's energy performance, for example through insulation, new windows, heat pumps, ventilation, or controls.

Is it better to tear down an old building and build an efficient new one?

Often not. Constructing a new building releases a large burst of emissions from materials like concrete and steel, and it can take decades of efficient operation to make that up. A good retrofit usually wins on carbon, especially in the near term.

How much energy can a retrofit save?

It depends on the depth. Simple measures may save modest amounts, while deep retrofits that combine envelope upgrades and new systems commonly aim to cut energy use by roughly half or more. The Empire State Building cut its energy use by about 38 percent.

Do retrofits pay for themselves?

Some measures, like lighting, controls, and air sealing, pay back quickly. Deep retrofits often need longer timeframes, incentives, or financing tied to the property, and their value also shows up in comfort, health, and building value rather than bills alone.

Can I retrofit in stages?

Yes, and most people do. The key is a plan that sequences the work so each step supports the next, ideally starting with the envelope and timing equipment changes to when old systems wear out.

Sources

The solution taxonomy follows the framework popularised by Project Drawdown. The analysis above is our own; for their carbon modeling and rankings, visit them directly.