Building Automation
Building automation is the central nervous system of a large building: the sensors, controllers, and software that decide when fans, pumps, chillers, boilers, and lights run. Most big buildings already have one, yet many waste energy anyway, because the system was set up years ago and nobody has tuned it since, which makes this one of the few climate solutions where the hardware is often already paid for.
The effect compounds within years. Put it in place and it keeps working.
Origins
The idea that a building could regulate itself goes back to 1883, when Warren Johnson, a Wisconsin teacher tired of janitors interrupting his classes to check the heat, patented an electric room thermostat. The company he founded grew into Johnson Controls, and for most of the next century building control meant pneumatic tubes and mechanical thermostats, with each system running more or less on its own.
Computers changed that in the 1970s and 1980s. Direct digital control let a single system watch hundreds of points across a building and adjust them in coordination. The energy crises of that era gave owners a strong reason to care. But early systems spoke proprietary languages, so a building tended to stay locked to one vendor for decades.
That began to change in 1995, when ASHRAE published BACnet, an open communication standard that let equipment from different makers talk to each other. Since then, cheaper sensors, internet connectivity, and analytics software have turned building automation from a set of switches into a source of data, and researchers at national laboratories have spent years showing how much energy is hiding in poorly tuned controls.
What it actually is
A building automation system, often called a BAS or building management system, connects three layers. At the bottom are sensors and actuators: temperature and humidity sensors, carbon dioxide monitors, occupancy detectors, and the motors that open dampers and valves. In the middle are controllers that run the logic for each piece of equipment. At the top is the supervisory software where operators set schedules, view alarms, and change settings.
When a system works well, it keeps a building comfortable with as little energy as possible. It runs heating and cooling only when spaces are occupied, brings in only as much outside air as the people inside need, lets temperatures float a little at night, and coordinates equipment so that one system is not heating while another is cooling the same space, a surprisingly common waste.
The problem is drift. Schedules get overridden and never reset. Sensors fall out of calibration. A damper sticks open, and the system quietly compensates by working harder. None of this sets off alarms; the building simply uses more energy than it should for years. Studies of real buildings find these faults are the norm rather than the exception.
That is why the newest layer matters: analytics and fault detection software that reads the system's own data, spots problems, and tells operators what to fix. Some tools go further and adjust settings automatically. The related practice of re-tuning or ongoing commissioning means periodically walking through the controls to reset schedules and setpoints to what the building actually needs.
Building automation also makes a building a better partner to the grid. A well controlled building can shift cooling earlier in the day, dim lights, or pause noncritical loads during peak hours, which matters more as grids add wind and solar.
The numbers
The big prize. A 2017 Pacific Northwest National Laboratory study estimated that using advanced controls fully across US commercial buildings could cut their energy use by about 29 percent.
Analytics in the real world. Through the Department of Energy's Smart Energy Analytics Campaign, Lawrence Berkeley National Laboratory tracked organizations using energy analytics and fault detection tools, and participants collectively saved about $95 million a year on energy bills.
A rule in Europe. Under the EU's Energy Performance of Buildings Directive, nonresidential buildings with heating or air conditioning systems larger than 290 kilowatts were required to have building automation and control systems by 2025.
An old idea, newly urgent. Automatic building control dates to 1883, when Warren Johnson patented an electric room thermostat, so the concept is well over a century old; what is new is the data and analytics that show how far most systems have drifted from their best settings.
Why it matters
Building automation matters because large buildings are where operational waste hides in plain sight. Most of the energy a commercial building will ever use is spent running it day to day, and the system that governs that spending is often decades out of tune. Fixing that does not require new chillers or new windows. It requires attention, data, and someone whose job it is to act on both.
A sense of proportion helps. Automation is not a substitute for a tight envelope or efficient equipment, and it does nothing to the carbon embodied in construction. Savings also decay if no one maintains them. Software that flags faults saves nothing if the alerts go unread. The honest pitch is that this is a management solution wearing a technology costume.
The human angle is easy to overlook. Good controls are also about air quality and comfort: bringing in enough fresh air, avoiding stuffy afternoons and freezing mornings, and catching problems before occupants complain. For hospitals, schools, and offices, the same system that saves energy is the one that keeps people healthy and focused. And as grids shift toward wind and solar, buildings that can flex their demand help make clean power more reliable, which means fewer fossil plants kept on standby.
What it actually takes
Tune what you already have. Before buying anything, walk through the existing controls: reset schedules, fix overrides, check that heating and cooling are not fighting each other, and recalibrate key sensors.
Add analytics with an owner. Fault detection software pays off only when a named person reviews its findings and has the budget and authority to fix them.
Insist on open standards. Specify BACnet or another open protocol and require documentation, so the building is not locked to one vendor and future upgrades stay affordable.
Bring small buildings along. Many smaller commercial buildings have no automation at all. Lower cost, simpler control packages and service models designed for them are where much of the untapped potential sits.
Secure it. Connected building systems are a cybersecurity target. Segment networks, change default passwords, and keep firmware current.
Where it matters most
In the Great Lakes Northwoods, cities like Chicago, Milwaukee, and Minneapolis have large stocks of older office towers, hospitals, and universities that face long, hard heating seasons. Many of these buildings already have automation systems that have drifted, so tuning them can yield large savings without major construction.
In the Pearl River Delta, dense clusters of high rise towers run air conditioning for most of the year in a hot, humid climate. Coordinating chillers, fans, and fresh air intelligently in these buildings has an outsized effect on both electricity demand and indoor comfort.
In the Dutch Lowlands and North Sea region and across the North German Plain and Baltic, European rules now require automation in larger nonresidential buildings, and grids are leaning heavily on wind. Buildings that can shift their demand to match windy hours help those grids run on more renewable power.
How to tell it’s being done well
Does someone own the results? In buildings where automation is done well, a specific person or team reviews the data and alarms regularly and has the authority to fix what they find.
Are savings measured and tracked over time? Good programs compare energy use against a weather adjusted baseline and watch for savings slipping, rather than declaring victory after installation.
Is the system open and documented? Open protocols, labeled points, and up to date control sequences mean any qualified contractor can work on it, not just the original installer.
Are comfort and air quality improving too? Fewer hot and cold complaints and steady fresh air rates are signs the system is serving people, not just trimming kilowatt hours.
Can the building flex for the grid? The most advanced buildings can shift or shed load on request, earning revenue from demand response and helping integrate renewable power.
What you can do
Anyone
- If you work in an office or campus building that is too hot, too cold, or lit up all night, report it to facilities, since those complaints often point directly to control problems.
- Ask your employer or school whether it tracks building energy use and who is responsible for acting on it.
Building owners and managers
- Commission a re-tuning walk through of your existing controls before planning capital upgrades; it is often the cheapest savings available.
- Add fault detection and analytics software, and assign a named person with time and budget to act on its findings every week.
Policymakers
- Pair building performance standards with support for ongoing commissioning and operator training, so owners have a practical path to compliance.
- Fund programs that bring affordable controls and analytics to small and midsize commercial buildings, which are often left out.
Business and investors
- Treat controls and analytics as an asset that protects building value, and include their condition in due diligence on acquisitions.
- Require open protocols and cybersecurity standards in building automation contracts to avoid vendor lock in and costly breaches.
Where this matters most
Who is working on this
We are researching which organizations in our directory of 8,493 actively work on this solution, and we only list an organization once we have verified it. That research is ongoing. In the meantime, search the directory yourself:
Questions
Is building automation only for large buildings?
Large buildings are where it is most common, but smaller commercial buildings can benefit too. Many small buildings have no central controls at all, and newer, simpler packages are making automation more affordable for them.
If a building already has a BAS, is the work done?
Usually not. Many systems drift out of tune over the years through overrides, failed sensors, and outdated schedules. Re-tuning and analytics are how buildings recover those losses.
How fast do these projects pay back?
Re-tuning existing controls often pays back quickly because it needs little or no new equipment. Analytics software and new controls take longer but tend to be among the more cost effective commercial efficiency upgrades, especially when paired with utility incentives.
Does automation make buildings more vulnerable to hacking?
Connected systems can be a target if poorly secured. Separating building networks from general IT, changing default passwords, and keeping software updated reduce the risk substantially.
How does this help renewable energy?
Buildings with good controls can shift when they use power, for example by precooling before a peak. That flexibility helps grids absorb more wind and solar without relying as heavily on fossil fuel plants for backup.
Sources
- Project Drawdown: Deploy Building Automation Systems Framework and classification. Cited, not reproduced.
- PNNL: Cut US commercial building energy use 29% with widespread controls Estimated national savings potential from advanced controls.
- Berkeley Lab: Building efficiency campaign drives $95M in annual energy savings Results of the Smart Energy Analytics Campaign.
- PNNL: Building Re-Tuning Structured approach to tuning existing building controls.
- Wattsense: Building automation and the EU energy rules EPBD requirement for automation in larger nonresidential buildings.
- Johnson Controls: Our founder Warren Johnson and the first electric room thermostat.
- BACnet: History Origins of the open building automation protocol.
The solution taxonomy follows the framework popularised by Project Drawdown. The analysis above is our own; for their carbon modeling and rankings, visit them directly.